Skip to main content

Huma Zareef Interiors

Lighting, Sockets & Switches Before First Fix

Your electrician needs to know where the lights, sockets and switches go. Let’s decide together.

Your layout is agreed, but turning it into dozens of small decisions is a different job. Where does the bedside switch go once the bed is centred? Which worktop needs sockets once the kettle and coffee machine have a home? In one live session, we’ll work through your room around your furniture and the way your family uses it.

  • £495, paid when you book
  • One room
  • 90-minute live video session with me
  • A room-specific PDF within 2 working days, to share with your electrician or builder

Sessions are at least 2 days after you book, Tuesday to Friday. Online across the UK, from Leeds.

3D visualisation of a bedroom with a centred bed and bedside lights

When to book

When to book

This works best once your room layout is agreed and before cables go into the walls of this room. The PDF needs to reach your electrician before they start.

Check your dates in 10 seconds: ask your electrician when they need your decisions (it’s often earlier than the day they start). Then take the session date you’d choose, add 2 working days, and make sure that’s at least a day before their date. The date check below does this for you.

Your electrician needs your decisionsWhat to do
3 weeks or more awayIdeal. Book now and you’ll have time to talk the PDF through with your electrician.
8 days to 3 weeks awayBook now. Choose the earliest date that works.
4 to 7 days awayIt depends on today’s date. Use the date check before you pay.
Less than 4 days awayThe PDF can’t reach you in time. See “My electrician starts in a couple of days” in the questions.

Next available dates are shown on the booking page after the date check below. What you see is what’s free.

What we’ll decide

What we’ll decide together

We start with where the furniture goes and what happens in the room each day. The positions follow from that.

Lighting

  • Where ceiling lights sit once the bed, sofa or dining table is placed, so the light lands where you’ll actually be.
  • Pendants over an island or table, centred on the furniture, not the ceiling.
  • Wall lights, reading lights and lamps, and which ones you’d like to turn on together from the door.
  • Softer evening lighting, so you aren’t choosing between “off” and “operating theatre”.

Sockets

  • Bedside sockets that sit beside the bedside table, not behind the headboard.
  • Kitchen worktop sockets planned around where the kettle, toaster and coffee machine will live, and where you’ll stand to use them.
  • The TV wall, the desk corner, the charging spot by the door, and a socket for the hoover on the landing.
  • The places people forget: the Christmas tree corner, a lamp by the reading chair, the garden doors.

Switches

  • Which side of the door the switch goes on, once you know which way the door opens.
  • Bedside switching once the bed is centred, so you aren’t getting up in the dark.
  • Switching at both ends of a stair, landing or long room, and from the garden doors at night.
  • How many switches go by each door, so a row of five doesn’t appear by accident.

I’m an interior designer, so I’m thinking about how you live in the room. Your electrician makes it safe and compliant. You need both.

Helpful guides: light switch and socket height in the UK · where to put sockets, room by room · what to decide before first fix · an example lighting and socket plan.

Bedroom floor plan showing furniture positions
3D visualisation of a kitchen island and worktop

One room

What counts as one room

One room is one space you’d call by one name, with up to two uses.

  • Counts as one: a bedroom, a kitchen-diner, a living room with a desk corner, a home office, a hallway with its stairs and landing.
  • Open-plan kitchen, dining and living: one room if it’s one continuous space of about 40m² or less. If it’s bigger, we’ll cover the kitchen and dining areas, and the living area can be a second booking.
  • Two bookings: two separate rooms, for example a bedroom and its en-suite bathroom, or the kitchen and the utility.

Not sure? Email me a photo of your plan before you book. I’ll reply within one working day with “one room” or “two bookings”.

(Image to add: three small floor-plan outlines labelled One room, One room and Two bookings. Alt: Diagrams showing a bedroom and a kitchen-diner as one room, and kitchen plus utility as two)

What you receive

What you receive

Within 2 working days of your session, I’ll email you a PDF called Lighting, Socket & Switch Layout for your room.

  • Your plan, marked up with the lights, sockets and switches we agreed, and a simple key.
  • Short notes on anything that needs explaining. For example: “Pendant centred on the dining table, not the room.”
  • Questions to confirm with your electrician, such as heights or anything near water.

Share it with your electrician or builder so you can talk through the positions together before first fix. They’ll confirm what works technically and may need to adjust some positions. That’s normal, and the PDF makes the conversation quicker.

(Image to add: one page from a sample PDF at full width, readable on a phone, with the footer note visible. Alt: Sample page of a Lighting, Socket & Switch Layout PDF)

How booking works

How booking works

  1. Check dates. Use the date check below, then choose a session on the booking page. Times shown are what’s free, at least 2 days ahead.
  2. Pay £495. Your session is confirmed straight away by email.
  3. Tell me about the room. Straight after booking, answer a few short questions on this page, including your first-fix date.
  4. Upload your plan. On the same page, upload the plan for this room. See “What to send me” below.
  5. I review your plans. If anything’s missing, I’ll email you within one working day.
  6. Your session. 90 minutes on a video call, with your plan on screen.
  7. Your PDF. In your inbox within 2 working days.

What to send me

What to send me

You’ll need, to book:

  • A plan of this room with measurements. An architect’s or kitchen designer’s drawing is ideal. A PDF or photo is fine.
  • Your first-fix date for this room, even if it’s approximate.
  • The two or three decisions you’re stuck on.

Helpful if you have them:

  • Furniture positions, or the kitchen layout from your kitchen company.
  • Any lighting or electrical layout your electrician, architect or builder has already drawn.
  • Photos of the room as it is now.

No measurements on your plan? That’s fine. Write the main ones on a printout or photo (wall lengths, door and window widths) and upload that. A clear hand sketch with measurements works too.

Files can be up to 5MB each. For anything bigger, paste a Google Drive, Dropbox or WeTransfer link into the form.

Questions

Questions

My electrician starts in a couple of days. Can you help?

Sessions are at least 2 days after booking and the PDF follows within 2 working days, so it won’t reach you before first fix. Ask your electrician whether they can do this room last. That often buys a week. If they can, check your dates and book.

I don’t have proper plans yet. Can I still book?

You’ll need a plan of the room with its main measurements. A marked-up photo or a clear hand sketch is fine. If your layout isn’t agreed yet, this isn’t the right service. A Floor Plan Review is the better place to start.

My electrician has already drawn a layout. Is this still useful?

Yes. Upload it with your plan and we’ll go through it against your furniture and routines. Some positions will stay as they are. Others may move. Either way, you’ll know why.

Why book this if my electrician is already helping?

Your electrician knows how to make the installation safe and compliant. I help you decide how you want to use the room: where you’ll sit, read, cook and charge your phone. The two jobs fit together.

Does my open-plan kitchen-diner count as one room?

Usually, yes. One continuous kitchen, dining and living space of about 40m² or less counts as one. If it’s bigger, or you’re unsure, email me your plan before booking.

Can I book more than one room?

Yes. Book a session for each room. If you’d like them on the same day, choose two slots and tell me in the form.

Who checks the technical requirements?

Your electrician. They’re responsible for the electrical design, whether each position is suitable, the rules where you live, installation, testing and certification. My PDF shows the design positions we agreed, for you to discuss with them. It isn’t an electrical design or an instruction to install.

What if my plans arrive late or something’s missing?

I’ll email you within one working day of booking. If I don’t have a usable plan 24 hours before your session, we’ll move it to the next free date at no charge.

Book

Ready to decide where everything goes?

£495 · one room · 90-minute live session · your PDF within 2 working days

Choose a date and pay on the booking page, then send me your room plan using the link in your confirmation. I’m Huma, a residential interior designer in Leeds. I’ve planned an extension in Calverley, Leeds, so I know how many decisions arrive at once. I work with homeowners across Leeds, Harrogate, York and Wakefield, and anywhere in the UK by video. About Huma

Already booked? Send your room plan here.

Questions first? hello@humazareef.co.uk

Huma Zareef, interior designer based in Leeds